Motor Type | WEG thermostatically protected 36kW motor |
---|---|
Electrical Requirements | 380 - 440V, 3 Phase, 50/60Hz |
Starter | Star Delta |
Pump Type | Single stage close coupled |
Pump Features | 316 stainless steel casing, casing cover and impeller |
Pump Output | 43 m3/hour, 5.9 bar @ 50Hz, 50 m3/hour, 8.4 bar @ 60Hz |
Seal Type | Eagle Burgmann single unbalanced chemical seal |
Connections | Inlet – 4” Fig 206 Female Hammer Lug Union, Outlet – 4” Fig 206 Male Hammer Lug Union, additional options available on request |
Control Panel | Mains isolator, emergency stop button, start/stop push buttons |
Deck Cable | 30 metre (when new) |
Moving & Handling | DNV 2.7-1/EN12079 certified frame, 4-leg certified sling set, forklift pockets |
Dimensions | 1260mm (L) x 1030mm (W) x 1230mm (H) |
Weight | Gross 1200 kg |
- Home
- Rental Equipment
- Pump Packages
- Electrically Driven Centrifugal Pump – Atex Zone 1
Electrically Driven Centrifugal Pump – Atex Zone 1
Enquire about this product
Complete the below form, and we will get back to you as soon as possible
-
-
At Brimmond Group we work across a wide range of sectors including energy, oil and gas, renewables, decommissioning, marine and construction.
We pride ourselves on our ability to ensure our equipment is safer, more maintenance friendly and more efficient than many on the market. Our range of heavy duty centrifugal pumps are no different, and are ideal for demanding applications including handling water, chemicals and hydrocarbons. They can be used either onshore or offshore to carry out:
- Well testing operations
- Chemical pickling
- Chemical flushing
- Tank emptying.
On it's own or as part of a unique Brimmond Group package our employees will happily help ensure you receive the product and service you require for your project.
-
Related case studies
Latest news
-
WellGear & Brimmond collaboration wins award
15 March 2024 -
Brimmond well-placed to deliver one of the most diverse ranges of hydraulic equipment in the UK and across the globe
8 March 2024 -
Brimmond's Managing Director gives business update in Subsea Expo interview
21 February 2024 -
Brimmond’s crane solution for decom sector’s weighty issue
7 February 2024 -
Work continues with Sir David Attenborough vessel
11 January 2024 -
Brimmond 2023 round-up
21 December 2023