An ROV umbilicalspooling project at Brimmond HQ which showcases some of the integrated services that we provide:

  • Bare drum line pull test and brake prior to spooling
  • 7000m of ROV umbilical spooled under tension
  • Brimmond Group’s 75 tonne spooler and 25 tonne back tension winch were mounted to our 1000 tonne test bed to carry out the spooling operation
  • Real time monitoring of spooling displayed on a laptop
  • Recorded data includes: back tension, distance spooled and spooling rate
  • A full spooling report is issued on completion of job